{"id":7801,"date":"2020-04-01T12:28:06","date_gmt":"2020-04-01T11:28:06","guid":{"rendered":"https:\/\/ronautica.com\/fishermens-cofradia-san-francisco-de-vigo-es\/"},"modified":"2024-06-18T09:10:36","modified_gmt":"2024-06-18T08:10:36","slug":"fishermens-cofradia-san-francisco-de-vigo-es","status":"publish","type":"post","link":"https:\/\/ronautica.com\/en\/fishermens-cofradia-san-francisco-de-vigo-es\/","title":{"rendered":"New protective pontoons for the entrance to the San Francisco Fishermen&#8217;s Guild in Vigo"},"content":{"rendered":"<p><span style=\"font-family: verdana, geneva, sans-serif; font-size: 10pt;\">With the installation of a new section of breakwater pontoon at the entrance of the Marina Deportiva in <strong>Bouzas, the Vigo Fishermen&#8217;s Guild has completed the project \u201cA sea of opportunities\u201d,<\/strong> carried out within the framework of the Local Action Group of the Fishing Sector R\u00eda de Vigo- A Guarda, and financed by the European Maritime Fund for Fisheries (FEMP).<\/span><\/p>\n<p><span style=\"font-family: verdana, geneva, sans-serif; font-size: 10pt;\">The design and orientation of the outermost section of the marina of the Marina de Bouzas, caused serious damage to the structure and moored boats during storms from the S \/ SW that affect the Galician coast. This is why, since their creation, the moorings associated with this section of the seawall have been underutilized and remained empty most of the year, adding to the high cost of maintenance for their upkeep. In the last two years part of this section has been dismantled and moved to another location to avoid further damage.<\/span><\/p>\n<p><span style=\"font-family: verdana, geneva, sans-serif; font-size: 10pt;\">Thanks to the installation of a new 44-meter long and 4-meter wide concrete floating pontoon section designed, manufactured and installed by RONAUTICA MARINAS, the entire port area has been improved, adding new berths and ensuring safer conditions at the other berths by significantly reducing the impact of wind waves generated during winter storms and by other vessel traffic.<\/span><\/p>\n<p><span style=\"font-family: verdana, geneva, sans-serif; font-size: 10pt;\">The work included the driving of new steel piles, 44 meters of concrete breakwater jetty, a 12-meter special module without steel reinforcement, 5 aluminum fingers and two access walkways.<\/span><\/p>\n<p><span style=\"font-family: verdana, geneva, sans-serif; font-size: 10pt;\"><a href=\"http:\/\/www.cofradiavigo.org\/index.php\/es\/\">http:\/\/www.cofradiavigo.org\/index.php\/es\/<\/a><\/span><\/p>\n<p><span style=\"font-family: verdana, geneva, sans-serif; font-size: 10pt;\">Below are images of the construction, launching, towing and assembly process of the installation:<\/span><\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignnone wp-image-3489 size-medium\" src=\"https:\/\/ronautica.com\/wp-content\/uploads\/01-IMG_20191226_113314-m-300x225.jpg\" alt=\"\" width=\"300\" height=\"225\" srcset=\"https:\/\/ronautica.com\/wp-content\/uploads\/01-IMG_20191226_113314-m-300x225.jpg 300w, https:\/\/ronautica.com\/wp-content\/uploads\/01-IMG_20191226_113314-m-1024x768.jpg 1024w, https:\/\/ronautica.com\/wp-content\/uploads\/01-IMG_20191226_113314-m-768x576.jpg 768w, https:\/\/ronautica.com\/wp-content\/uploads\/01-IMG_20191226_113314-m-1536x1152.jpg 1536w, https:\/\/ronautica.com\/wp-content\/uploads\/01-IMG_20191226_113314-m-2048x1536.jpg 2048w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/> <img decoding=\"async\" class=\"alignnone wp-image-3490 size-medium\" src=\"https:\/\/ronautica.com\/wp-content\/uploads\/02-IMG_20191226_114129-300x225.jpg\" alt=\"\" width=\"300\" height=\"225\" srcset=\"https:\/\/ronautica.com\/wp-content\/uploads\/02-IMG_20191226_114129-300x225.jpg 300w, https:\/\/ronautica.com\/wp-content\/uploads\/02-IMG_20191226_114129-1024x768.jpg 1024w, https:\/\/ronautica.com\/wp-content\/uploads\/02-IMG_20191226_114129-768x576.jpg 768w, https:\/\/ronautica.com\/wp-content\/uploads\/02-IMG_20191226_114129-1536x1152.jpg 1536w, https:\/\/ronautica.com\/wp-content\/uploads\/02-IMG_20191226_114129-2048x1536.jpg 2048w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><img decoding=\"async\" class=\"alignnone wp-image-3491 size-medium\" src=\"https:\/\/ronautica.com\/wp-content\/uploads\/04-IMG_20191226_120914-225x300.jpg\" alt=\"\" width=\"225\" height=\"300\" srcset=\"https:\/\/ronautica.com\/wp-content\/uploads\/04-IMG_20191226_120914-225x300.jpg 225w, https:\/\/ronautica.com\/wp-content\/uploads\/04-IMG_20191226_120914-768x1024.jpg 768w, https:\/\/ronautica.com\/wp-content\/uploads\/04-IMG_20191226_120914-1152x1536.jpg 1152w, https:\/\/ronautica.com\/wp-content\/uploads\/04-IMG_20191226_120914-1536x2048.jpg 1536w, https:\/\/ronautica.com\/wp-content\/uploads\/04-IMG_20191226_120914-scaled.jpg 1920w\" sizes=\"(max-width: 225px) 100vw, 225px\" \/>   <img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-3492 size-medium\" src=\"https:\/\/ronautica.com\/wp-content\/uploads\/05-IMG_20191226_121728-m-300x225.jpg\" alt=\"\" width=\"300\" height=\"225\" srcset=\"https:\/\/ronautica.com\/wp-content\/uploads\/05-IMG_20191226_121728-m-300x225.jpg 300w, https:\/\/ronautica.com\/wp-content\/uploads\/05-IMG_20191226_121728-m-1024x768.jpg 1024w, https:\/\/ronautica.com\/wp-content\/uploads\/05-IMG_20191226_121728-m-768x576.jpg 768w, https:\/\/ronautica.com\/wp-content\/uploads\/05-IMG_20191226_121728-m-1536x1152.jpg 1536w, https:\/\/ronautica.com\/wp-content\/uploads\/05-IMG_20191226_121728-m-2048x1536.jpg 2048w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-3493 size-medium\" src=\"https:\/\/ronautica.com\/wp-content\/uploads\/07-IMG_20191226_123159-m2-300x225.jpg\" alt=\"\" width=\"300\" height=\"225\" srcset=\"https:\/\/ronautica.com\/wp-content\/uploads\/07-IMG_20191226_123159-m2-300x225.jpg 300w, https:\/\/ronautica.com\/wp-content\/uploads\/07-IMG_20191226_123159-m2-1024x768.jpg 1024w, https:\/\/ronautica.com\/wp-content\/uploads\/07-IMG_20191226_123159-m2-768x576.jpg 768w, https:\/\/ronautica.com\/wp-content\/uploads\/07-IMG_20191226_123159-m2-1536x1152.jpg 1536w, https:\/\/ronautica.com\/wp-content\/uploads\/07-IMG_20191226_123159-m2-2048x1536.jpg 2048w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/> <img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-3494 size-medium\" src=\"https:\/\/ronautica.com\/wp-content\/uploads\/08-IMG_20191226_141313-m-300x225.jpg\" alt=\"\" width=\"300\" height=\"225\" srcset=\"https:\/\/ronautica.com\/wp-content\/uploads\/08-IMG_20191226_141313-m-300x225.jpg 300w, https:\/\/ronautica.com\/wp-content\/uploads\/08-IMG_20191226_141313-m-1024x768.jpg 1024w, https:\/\/ronautica.com\/wp-content\/uploads\/08-IMG_20191226_141313-m-768x576.jpg 768w, https:\/\/ronautica.com\/wp-content\/uploads\/08-IMG_20191226_141313-m-1536x1152.jpg 1536w, https:\/\/ronautica.com\/wp-content\/uploads\/08-IMG_20191226_141313-m-2048x1536.jpg 2048w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-3496 size-medium\" src=\"https:\/\/ronautica.com\/wp-content\/uploads\/10-IMG_20191226_141536-300x225.jpg\" alt=\"\" width=\"300\" height=\"225\" srcset=\"https:\/\/ronautica.com\/wp-content\/uploads\/10-IMG_20191226_141536-300x225.jpg 300w, https:\/\/ronautica.com\/wp-content\/uploads\/10-IMG_20191226_141536-1024x768.jpg 1024w, https:\/\/ronautica.com\/wp-content\/uploads\/10-IMG_20191226_141536-768x576.jpg 768w, https:\/\/ronautica.com\/wp-content\/uploads\/10-IMG_20191226_141536-1536x1152.jpg 1536w, https:\/\/ronautica.com\/wp-content\/uploads\/10-IMG_20191226_141536-2048x1536.jpg 2048w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/> <img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-3497 size-medium\" src=\"https:\/\/ronautica.com\/wp-content\/uploads\/11-093-m-300x225.jpg\" alt=\"\" width=\"300\" height=\"225\" srcset=\"https:\/\/ronautica.com\/wp-content\/uploads\/11-093-m-300x225.jpg 300w, https:\/\/ronautica.com\/wp-content\/uploads\/11-093-m-1024x768.jpg 1024w, https:\/\/ronautica.com\/wp-content\/uploads\/11-093-m-768x576.jpg 768w, https:\/\/ronautica.com\/wp-content\/uploads\/11-093-m-1536x1152.jpg 1536w, https:\/\/ronautica.com\/wp-content\/uploads\/11-093-m-2048x1536.jpg 2048w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-3498\" src=\"https:\/\/ronautica.com\/wp-content\/uploads\/13-130-m-300x225.jpg\" alt=\"\" width=\"300\" height=\"225\" srcset=\"https:\/\/ronautica.com\/wp-content\/uploads\/13-130-m-300x225.jpg 300w, https:\/\/ronautica.com\/wp-content\/uploads\/13-130-m-1024x768.jpg 1024w, https:\/\/ronautica.com\/wp-content\/uploads\/13-130-m-768x576.jpg 768w, https:\/\/ronautica.com\/wp-content\/uploads\/13-130-m-1536x1152.jpg 1536w, https:\/\/ronautica.com\/wp-content\/uploads\/13-130-m-2048x1536.jpg 2048w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/> <img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-3499\" src=\"https:\/\/ronautica.com\/wp-content\/uploads\/14-104-300x225.jpg\" alt=\"\" width=\"300\" height=\"225\" srcset=\"https:\/\/ronautica.com\/wp-content\/uploads\/14-104-300x225.jpg 300w, https:\/\/ronautica.com\/wp-content\/uploads\/14-104-1024x768.jpg 1024w, https:\/\/ronautica.com\/wp-content\/uploads\/14-104-768x576.jpg 768w, https:\/\/ronautica.com\/wp-content\/uploads\/14-104-1536x1152.jpg 1536w, https:\/\/ronautica.com\/wp-content\/uploads\/14-104-2048x1536.jpg 2048w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-3500\" src=\"https:\/\/ronautica.com\/wp-content\/uploads\/17-192-m-300x225.jpg\" alt=\"\" width=\"300\" height=\"225\" srcset=\"https:\/\/ronautica.com\/wp-content\/uploads\/17-192-m-300x225.jpg 300w, https:\/\/ronautica.com\/wp-content\/uploads\/17-192-m-1024x768.jpg 1024w, https:\/\/ronautica.com\/wp-content\/uploads\/17-192-m-768x576.jpg 768w, https:\/\/ronautica.com\/wp-content\/uploads\/17-192-m-1536x1152.jpg 1536w, https:\/\/ronautica.com\/wp-content\/uploads\/17-192-m-2048x1536.jpg 2048w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/> <img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-3501\" src=\"https:\/\/ronautica.com\/wp-content\/uploads\/19-IMG_20200103_124346-m-225x300.jpg\" alt=\"\" width=\"225\" height=\"300\" srcset=\"https:\/\/ronautica.com\/wp-content\/uploads\/19-IMG_20200103_124346-m-225x300.jpg 225w, https:\/\/ronautica.com\/wp-content\/uploads\/19-IMG_20200103_124346-m-768x1024.jpg 768w, https:\/\/ronautica.com\/wp-content\/uploads\/19-IMG_20200103_124346-m-1152x1536.jpg 1152w, https:\/\/ronautica.com\/wp-content\/uploads\/19-IMG_20200103_124346-m-1536x2048.jpg 1536w, https:\/\/ronautica.com\/wp-content\/uploads\/19-IMG_20200103_124346-m-scaled.jpg 1920w\" sizes=\"(max-width: 225px) 100vw, 225px\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>With the installation of a new section of breakwater pontoon at the entrance of the Marina Deportiva in Bouzas, the Vigo Fishermen&#8217;s Guild has completed the project \u201cA sea of opportunities\u201d, carried out within the framework of the Local Action Group of the Fishing Sector R\u00eda de Vigo- A Guarda, and financed by the European [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":8360,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[25],"tags":[],"class_list":["post-7801","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-projects"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v24.8.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>New protective pontoons for the entrance to the San Francisco Fishermen&#039;s Guild in Vigo - Ron\u00e1utica Marinas \u00bb Passion, experience, innovation... Marinas for life<\/title>\n<meta name=\"description\" content=\"With the installation of a new section of breakwater pontoon at the entrance of the Marina Deportiva de Bouzas, the Fishermen&#039;s Association of Vigo has completed the project &quot;A sea of opportunities&quot;, carried out within the aid of the Local Action Group of the Fishing Sector Ria de Vigo- A Guarda, and financed by the European Maritime Fund for Fisheries (FEMP). The design and orientation of the outermost section of the marina of the Marina de Bouzas, caused serious damage to the structure and moored boats during storms S \/ SW affecting the Galician coast. That is why, since its creation, the moorings associated with this section of the jetty have been underutilized and remained empty most of the year, adding to this a high maintenance cost for its conservation. In the last two years part of this section has been dismantled and moved to another location to avoid further damage.Thanks to the installation of a new section of concrete floating pontoon 44 meters long and 4 meters wide designed, manufactured and installed by RONAUTICA MARINAS, the entire harbor area has been improved, adding new berths and ensuring safer conditions at the other berths by significantly reducing the impact of wind surge generated during winter storms and by other vessel traffic. The work included the driving of new steel piles, 44 meters of concrete breakwater pontoon, a special 12-meter module without steel reinforcement, 5 aluminum fingers and two access gangways, as well as images of the construction process, launching, towing and installation of the facility:\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/ronautica.com\/en\/fishermens-cofradia-san-francisco-de-vigo-es\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"New protective pontoons for the entrance to the San Francisco Fishermen&#039;s Guild in Vigo - Ron\u00e1utica Marinas \u00bb Passion, experience, innovation... Marinas for life\" \/>\n<meta property=\"og:description\" content=\"With the installation of a new section of breakwater pontoon at the entrance of the Marina Deportiva de Bouzas, the Fishermen&#039;s Association of Vigo has completed the project &quot;A sea of opportunities&quot;, carried out within the aid of the Local Action Group of the Fishing Sector Ria de Vigo- A Guarda, and financed by the European Maritime Fund for Fisheries (FEMP). The design and orientation of the outermost section of the marina of the Marina de Bouzas, caused serious damage to the structure and moored boats during storms S \/ SW affecting the Galician coast. That is why, since its creation, the moorings associated with this section of the jetty have been underutilized and remained empty most of the year, adding to this a high maintenance cost for its conservation. In the last two years part of this section has been dismantled and moved to another location to avoid further damage.Thanks to the installation of a new section of concrete floating pontoon 44 meters long and 4 meters wide designed, manufactured and installed by RONAUTICA MARINAS, the entire harbor area has been improved, adding new berths and ensuring safer conditions at the other berths by significantly reducing the impact of wind surge generated during winter storms and by other vessel traffic. The work included the driving of new steel piles, 44 meters of concrete breakwater pontoon, a special 12-meter module without steel reinforcement, 5 aluminum fingers and two access gangways, as well as images of the construction process, launching, towing and installation of the facility:\" \/>\n<meta property=\"og:url\" content=\"https:\/\/ronautica.com\/en\/fishermens-cofradia-san-francisco-de-vigo-es\/\" \/>\n<meta property=\"og:site_name\" content=\"Ron\u00e1utica Marinas \u00bb Passion, experience, innovation... Marinas for life\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ronauticamarinas\/\" \/>\n<meta property=\"article:published_time\" content=\"2020-04-01T11:28:06+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-06-18T08:10:36+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/ronautica.com\/wp-content\/uploads\/20-161-m2-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1471\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Ron\u00e1utica\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Ron\u00e1utica\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/ronautica.com\/en\/fishermens-cofradia-san-francisco-de-vigo-es\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/ronautica.com\/en\/fishermens-cofradia-san-francisco-de-vigo-es\/\"},\"author\":{\"name\":\"Ron\u00e1utica\",\"@id\":\"https:\/\/ronautica.com\/#\/schema\/person\/aaf4d753c2ccaf3b4e1fef6015e4347f\"},\"headline\":\"New protective pontoons for the entrance to the San Francisco Fishermen&#8217;s Guild in Vigo\",\"datePublished\":\"2020-04-01T11:28:06+00:00\",\"dateModified\":\"2024-06-18T08:10:36+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/ronautica.com\/en\/fishermens-cofradia-san-francisco-de-vigo-es\/\"},\"wordCount\":275,\"publisher\":{\"@id\":\"https:\/\/ronautica.com\/#organization\"},\"image\":{\"@id\":\"https:\/\/ronautica.com\/en\/fishermens-cofradia-san-francisco-de-vigo-es\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/ronautica.com\/wp-content\/uploads\/20-161-m2-scaled.jpg\",\"articleSection\":[\"Projects\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/ronautica.com\/en\/fishermens-cofradia-san-francisco-de-vigo-es\/\",\"url\":\"https:\/\/ronautica.com\/en\/fishermens-cofradia-san-francisco-de-vigo-es\/\",\"name\":\"New protective pontoons for the entrance to the San Francisco Fishermen's Guild in Vigo - Ron\u00e1utica Marinas \u00bb Passion, experience, innovation... Marinas for life\",\"isPartOf\":{\"@id\":\"https:\/\/ronautica.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/ronautica.com\/en\/fishermens-cofradia-san-francisco-de-vigo-es\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/ronautica.com\/en\/fishermens-cofradia-san-francisco-de-vigo-es\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/ronautica.com\/wp-content\/uploads\/20-161-m2-scaled.jpg\",\"datePublished\":\"2020-04-01T11:28:06+00:00\",\"dateModified\":\"2024-06-18T08:10:36+00:00\",\"description\":\"With the installation of a new section of breakwater pontoon at the entrance of the Marina Deportiva de Bouzas, the Fishermen's Association of Vigo has completed the project \\\"A sea of opportunities\\\", carried out within the aid of the Local Action Group of the Fishing Sector Ria de Vigo- A Guarda, and financed by the European Maritime Fund for Fisheries (FEMP). The design and orientation of the outermost section of the marina of the Marina de Bouzas, caused serious damage to the structure and moored boats during storms S \/ SW affecting the Galician coast. That is why, since its creation, the moorings associated with this section of the jetty have been underutilized and remained empty most of the year, adding to this a high maintenance cost for its conservation. In the last two years part of this section has been dismantled and moved to another location to avoid further damage.Thanks to the installation of a new section of concrete floating pontoon 44 meters long and 4 meters wide designed, manufactured and installed by RONAUTICA MARINAS, the entire harbor area has been improved, adding new berths and ensuring safer conditions at the other berths by significantly reducing the impact of wind surge generated during winter storms and by other vessel traffic. The work included the driving of new steel piles, 44 meters of concrete breakwater pontoon, a special 12-meter module without steel reinforcement, 5 aluminum fingers and two access gangways, as well as images of the construction process, launching, towing and installation of the facility:\",\"breadcrumb\":{\"@id\":\"https:\/\/ronautica.com\/en\/fishermens-cofradia-san-francisco-de-vigo-es\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/ronautica.com\/en\/fishermens-cofradia-san-francisco-de-vigo-es\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/ronautica.com\/en\/fishermens-cofradia-san-francisco-de-vigo-es\/#primaryimage\",\"url\":\"https:\/\/ronautica.com\/wp-content\/uploads\/20-161-m2-scaled.jpg\",\"contentUrl\":\"https:\/\/ronautica.com\/wp-content\/uploads\/20-161-m2-scaled.jpg\",\"width\":2560,\"height\":1471},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/ronautica.com\/en\/fishermens-cofradia-san-francisco-de-vigo-es\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\/\/ronautica.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"New protective pontoons for the entrance to the San Francisco Fishermen&#8217;s Guild in Vigo\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/ronautica.com\/#website\",\"url\":\"https:\/\/ronautica.com\/\",\"name\":\"Ron\u00e1utica Marinas \u00bb Passion, experience, innovation... Marinas for life\",\"description\":\"Somos la primera empresa en Espa\u00f1a y una de las pioneras en Europa en desarrollar pantalanes flotantes y proyectos completos de marinas desde 1989.\",\"publisher\":{\"@id\":\"https:\/\/ronautica.com\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/ronautica.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/ronautica.com\/#organization\",\"name\":\"Ron\u00e1utica Marinas \u00bb Passion, experience, innovation... Marinas for life\",\"url\":\"https:\/\/ronautica.com\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/ronautica.com\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/ronautica.com\/wp-content\/uploads\/logo@x2.png\",\"contentUrl\":\"https:\/\/ronautica.com\/wp-content\/uploads\/logo@x2.png\",\"width\":514,\"height\":94,\"caption\":\"Ron\u00e1utica Marinas \u00bb Passion, experience, innovation... Marinas for life\"},\"image\":{\"@id\":\"https:\/\/ronautica.com\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/ronauticamarinas\/\",\"https:\/\/www.instagram.com\/ronauticamarinas\/\",\"https:\/\/www.linkedin.com\/company\/ronautica-marinas\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/ronautica.com\/#\/schema\/person\/aaf4d753c2ccaf3b4e1fef6015e4347f\",\"name\":\"Ron\u00e1utica\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/ronautica.com\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/8ed7a91a5859353f2d7eaf592719082cc3b4202aaaca25a3b3994cb0af0cb35b?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/8ed7a91a5859353f2d7eaf592719082cc3b4202aaaca25a3b3994cb0af0cb35b?s=96&d=mm&r=g\",\"caption\":\"Ron\u00e1utica\"},\"url\":\"https:\/\/ronautica.com\/en\/author\/ronautica-admin\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"New protective pontoons for the entrance to the San Francisco Fishermen's Guild in Vigo - Ron\u00e1utica Marinas \u00bb Passion, experience, innovation... Marinas for life","description":"With the installation of a new section of breakwater pontoon at the entrance of the Marina Deportiva de Bouzas, the Fishermen's Association of Vigo has completed the project \"A sea of opportunities\", carried out within the aid of the Local Action Group of the Fishing Sector Ria de Vigo- A Guarda, and financed by the European Maritime Fund for Fisheries (FEMP). The design and orientation of the outermost section of the marina of the Marina de Bouzas, caused serious damage to the structure and moored boats during storms S \/ SW affecting the Galician coast. That is why, since its creation, the moorings associated with this section of the jetty have been underutilized and remained empty most of the year, adding to this a high maintenance cost for its conservation. In the last two years part of this section has been dismantled and moved to another location to avoid further damage.Thanks to the installation of a new section of concrete floating pontoon 44 meters long and 4 meters wide designed, manufactured and installed by RONAUTICA MARINAS, the entire harbor area has been improved, adding new berths and ensuring safer conditions at the other berths by significantly reducing the impact of wind surge generated during winter storms and by other vessel traffic. The work included the driving of new steel piles, 44 meters of concrete breakwater pontoon, a special 12-meter module without steel reinforcement, 5 aluminum fingers and two access gangways, as well as images of the construction process, launching, towing and installation of the facility:","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/ronautica.com\/en\/fishermens-cofradia-san-francisco-de-vigo-es\/","og_locale":"en_US","og_type":"article","og_title":"New protective pontoons for the entrance to the San Francisco Fishermen's Guild in Vigo - Ron\u00e1utica Marinas \u00bb Passion, experience, innovation... Marinas for life","og_description":"With the installation of a new section of breakwater pontoon at the entrance of the Marina Deportiva de Bouzas, the Fishermen's Association of Vigo has completed the project \"A sea of opportunities\", carried out within the aid of the Local Action Group of the Fishing Sector Ria de Vigo- A Guarda, and financed by the European Maritime Fund for Fisheries (FEMP). The design and orientation of the outermost section of the marina of the Marina de Bouzas, caused serious damage to the structure and moored boats during storms S \/ SW affecting the Galician coast. That is why, since its creation, the moorings associated with this section of the jetty have been underutilized and remained empty most of the year, adding to this a high maintenance cost for its conservation. In the last two years part of this section has been dismantled and moved to another location to avoid further damage.Thanks to the installation of a new section of concrete floating pontoon 44 meters long and 4 meters wide designed, manufactured and installed by RONAUTICA MARINAS, the entire harbor area has been improved, adding new berths and ensuring safer conditions at the other berths by significantly reducing the impact of wind surge generated during winter storms and by other vessel traffic. The work included the driving of new steel piles, 44 meters of concrete breakwater pontoon, a special 12-meter module without steel reinforcement, 5 aluminum fingers and two access gangways, as well as images of the construction process, launching, towing and installation of the facility:","og_url":"https:\/\/ronautica.com\/en\/fishermens-cofradia-san-francisco-de-vigo-es\/","og_site_name":"Ron\u00e1utica Marinas \u00bb Passion, experience, innovation... Marinas for life","article_publisher":"https:\/\/www.facebook.com\/ronauticamarinas\/","article_published_time":"2020-04-01T11:28:06+00:00","article_modified_time":"2024-06-18T08:10:36+00:00","og_image":[{"width":2560,"height":1471,"url":"https:\/\/ronautica.com\/wp-content\/uploads\/20-161-m2-scaled.jpg","type":"image\/jpeg"}],"author":"Ron\u00e1utica","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Ron\u00e1utica","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/ronautica.com\/en\/fishermens-cofradia-san-francisco-de-vigo-es\/#article","isPartOf":{"@id":"https:\/\/ronautica.com\/en\/fishermens-cofradia-san-francisco-de-vigo-es\/"},"author":{"name":"Ron\u00e1utica","@id":"https:\/\/ronautica.com\/#\/schema\/person\/aaf4d753c2ccaf3b4e1fef6015e4347f"},"headline":"New protective pontoons for the entrance to the San Francisco Fishermen&#8217;s Guild in Vigo","datePublished":"2020-04-01T11:28:06+00:00","dateModified":"2024-06-18T08:10:36+00:00","mainEntityOfPage":{"@id":"https:\/\/ronautica.com\/en\/fishermens-cofradia-san-francisco-de-vigo-es\/"},"wordCount":275,"publisher":{"@id":"https:\/\/ronautica.com\/#organization"},"image":{"@id":"https:\/\/ronautica.com\/en\/fishermens-cofradia-san-francisco-de-vigo-es\/#primaryimage"},"thumbnailUrl":"https:\/\/ronautica.com\/wp-content\/uploads\/20-161-m2-scaled.jpg","articleSection":["Projects"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/ronautica.com\/en\/fishermens-cofradia-san-francisco-de-vigo-es\/","url":"https:\/\/ronautica.com\/en\/fishermens-cofradia-san-francisco-de-vigo-es\/","name":"New protective pontoons for the entrance to the San Francisco Fishermen's Guild in Vigo - Ron\u00e1utica Marinas \u00bb Passion, experience, innovation... Marinas for life","isPartOf":{"@id":"https:\/\/ronautica.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/ronautica.com\/en\/fishermens-cofradia-san-francisco-de-vigo-es\/#primaryimage"},"image":{"@id":"https:\/\/ronautica.com\/en\/fishermens-cofradia-san-francisco-de-vigo-es\/#primaryimage"},"thumbnailUrl":"https:\/\/ronautica.com\/wp-content\/uploads\/20-161-m2-scaled.jpg","datePublished":"2020-04-01T11:28:06+00:00","dateModified":"2024-06-18T08:10:36+00:00","description":"With the installation of a new section of breakwater pontoon at the entrance of the Marina Deportiva de Bouzas, the Fishermen's Association of Vigo has completed the project \"A sea of opportunities\", carried out within the aid of the Local Action Group of the Fishing Sector Ria de Vigo- A Guarda, and financed by the European Maritime Fund for Fisheries (FEMP). The design and orientation of the outermost section of the marina of the Marina de Bouzas, caused serious damage to the structure and moored boats during storms S \/ SW affecting the Galician coast. That is why, since its creation, the moorings associated with this section of the jetty have been underutilized and remained empty most of the year, adding to this a high maintenance cost for its conservation. In the last two years part of this section has been dismantled and moved to another location to avoid further damage.Thanks to the installation of a new section of concrete floating pontoon 44 meters long and 4 meters wide designed, manufactured and installed by RONAUTICA MARINAS, the entire harbor area has been improved, adding new berths and ensuring safer conditions at the other berths by significantly reducing the impact of wind surge generated during winter storms and by other vessel traffic. The work included the driving of new steel piles, 44 meters of concrete breakwater pontoon, a special 12-meter module without steel reinforcement, 5 aluminum fingers and two access gangways, as well as images of the construction process, launching, towing and installation of the facility:","breadcrumb":{"@id":"https:\/\/ronautica.com\/en\/fishermens-cofradia-san-francisco-de-vigo-es\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/ronautica.com\/en\/fishermens-cofradia-san-francisco-de-vigo-es\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/ronautica.com\/en\/fishermens-cofradia-san-francisco-de-vigo-es\/#primaryimage","url":"https:\/\/ronautica.com\/wp-content\/uploads\/20-161-m2-scaled.jpg","contentUrl":"https:\/\/ronautica.com\/wp-content\/uploads\/20-161-m2-scaled.jpg","width":2560,"height":1471},{"@type":"BreadcrumbList","@id":"https:\/\/ronautica.com\/en\/fishermens-cofradia-san-francisco-de-vigo-es\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/ronautica.com\/en\/"},{"@type":"ListItem","position":2,"name":"New protective pontoons for the entrance to the San Francisco Fishermen&#8217;s Guild in Vigo"}]},{"@type":"WebSite","@id":"https:\/\/ronautica.com\/#website","url":"https:\/\/ronautica.com\/","name":"Ron\u00e1utica Marinas \u00bb Passion, experience, innovation... Marinas for life","description":"Somos la primera empresa en Espa\u00f1a y una de las pioneras en Europa en desarrollar pantalanes flotantes y proyectos completos de marinas desde 1989.","publisher":{"@id":"https:\/\/ronautica.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/ronautica.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/ronautica.com\/#organization","name":"Ron\u00e1utica Marinas \u00bb Passion, experience, innovation... Marinas for life","url":"https:\/\/ronautica.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/ronautica.com\/#\/schema\/logo\/image\/","url":"https:\/\/ronautica.com\/wp-content\/uploads\/logo@x2.png","contentUrl":"https:\/\/ronautica.com\/wp-content\/uploads\/logo@x2.png","width":514,"height":94,"caption":"Ron\u00e1utica Marinas \u00bb Passion, experience, innovation... Marinas for life"},"image":{"@id":"https:\/\/ronautica.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ronauticamarinas\/","https:\/\/www.instagram.com\/ronauticamarinas\/","https:\/\/www.linkedin.com\/company\/ronautica-marinas\/"]},{"@type":"Person","@id":"https:\/\/ronautica.com\/#\/schema\/person\/aaf4d753c2ccaf3b4e1fef6015e4347f","name":"Ron\u00e1utica","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/ronautica.com\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/8ed7a91a5859353f2d7eaf592719082cc3b4202aaaca25a3b3994cb0af0cb35b?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/8ed7a91a5859353f2d7eaf592719082cc3b4202aaaca25a3b3994cb0af0cb35b?s=96&d=mm&r=g","caption":"Ron\u00e1utica"},"url":"https:\/\/ronautica.com\/en\/author\/ronautica-admin\/"}]}},"_links":{"self":[{"href":"https:\/\/ronautica.com\/en\/wp-json\/wp\/v2\/posts\/7801","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ronautica.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ronautica.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ronautica.com\/en\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/ronautica.com\/en\/wp-json\/wp\/v2\/comments?post=7801"}],"version-history":[{"count":0,"href":"https:\/\/ronautica.com\/en\/wp-json\/wp\/v2\/posts\/7801\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ronautica.com\/en\/wp-json\/wp\/v2\/media\/8360"}],"wp:attachment":[{"href":"https:\/\/ronautica.com\/en\/wp-json\/wp\/v2\/media?parent=7801"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ronautica.com\/en\/wp-json\/wp\/v2\/categories?post=7801"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ronautica.com\/en\/wp-json\/wp\/v2\/tags?post=7801"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}