Ayamonte, Huelva

TECHNICAL ASPECTS

  • LOCATION: Passenger boarding terminal in Ayamonte, Huelva
  • YEAR OF INSTALLATION: 2020.
  • DOCK SYSTEM: 30 metres long pontoon by 3 metres wide. 27-metre gangway and stainless steel handrail.
  • CLIENT: Public Ports Agency of Andalusia
  • CONSULTOR: Estudio7

Description

New jetty for the passenger boarding terminal at the port of Ayamonte. With dimensions of 30 by 3 metres and almost 1 metre of freeboard, suitable for the type of vessel in use and which will facilitate the safe disembarkation of passengers. Access to the pontoons will be via a 27-metre-long gangway. In addition, a stainless steel handrail will be installed around the pontoon.

Scroll to top