TECHNICAL ASPECTS
- LOCATION: Passenger boarding terminal in Ayamonte, Huelva
- YEAR OF INSTALLATION: 2020.
- DOCK SYSTEM: 30 metres long pontoon by 3 metres wide. 27-metre gangway and stainless steel handrail.
- CLIENT: Public Ports Agency of Andalusia
- CONSULTOR: Estudio7
Description
New jetty for the passenger boarding terminal at the port of Ayamonte. With dimensions of 30 by 3 metres and almost 1 metre of freeboard, suitable for the type of vessel in use and which will facilitate the safe disembarkation of passengers. Access to the pontoons will be via a 27-metre-long gangway. In addition, a stainless steel handrail will be installed around the pontoon.